The presentation will consider:

·         Availability of design drawings and system specifications.
·         Availability of as built drawings and system specifications.
·         Details of contract packages awarded associated with each element of the envelope.
·         Availability of QA documentation associated with each contract/element of the envelope.
·         Minimum survey requirements to establish the design information represents a true record of the as built condition.
·         In the absence of robust QA documentation extent of more comprehensive survey requirements to establish as built condition.
·         Recording the survey information.
·         Challenges of identifying materials and products.
·         Making sense of endoscopic inspection videos and photographs.
·         Risk review of the findings.
·         Relationship of risk review with regulatory and EWS1 requirements.